Exposing House Footings for Structural Inspections in Underwood & Long Eaton

When cracks appear in brickwork or movement becomes noticeable, discovering what is happening beneath ground level is the essential first step. Over the past two weeks, our team has been out in Underwood, Nottinghamshire and Long Eaton, Derbyshire, excavating trial pits to expose property footings for two homeowners dealing with structural concerns.

How We Help With Structural Enquiries

Having worked on residential brickwork and foundations for many years, we can offer practical, experience-based advice. However, we are always upfront with our customers: we are bricklayers and builders, not structural engineers.

When structural movement is suspected, an engineer needs clear physical access to the foundations before they can diagnose the issue or specify the right repair—whether that involves underpinning, crack stitching, or drainage improvements. To make the process simple and transparent, our standard approach is:

  1. Quote to Expose the Area: We provide a clear, fixed price to carefully excavate the ground around the affected wall down to the base of the footings.
  2. Coordinate With an Engineer: Once the brickwork and concrete foundations are cleanly exposed and measured, the customer can bring in their own structural engineer to carry out the inspection, or we can happily recommend trusted local engineers we work alongside regularly.

Recent Trial Pits: Underwood & Long Eaton

Both recent jobs required careful hand-digging right alongside the existing external brickwork to reveal the condition, depth, and construction of the original footings without causing any further disturbance to the structure. With the trenches excavated and the foundations clearly visible, both homeowners now have everything ready for their structural engineers to assess the ground conditions and put a solid remediation plan in place.

Noticed structural cracks or movement in your home? If you’ve been advised to have your foundations inspected—or want an honest initial look at suspect brickwork in Nottinghamshire or Derbyshire—get in touch with our team to arrange a quote for exposing your footings.

Categories
Brickwork External

Storm Damage Wall & Driveway Pillar Rebuild in Arnold, Nottingham

When high winds swept through Arnold, Nottingham, a residential boundary wall on Laneham Avenue suffered severe structural failure. Brought in to carry out the restoration on behalf of the homeowner’s insurance company, our team completed a full rebuild of both the garden retaining wall and the adjoining driveway pillars.

Assessing the Damage & Material Attrition

Once on site, we cleared the collapsed masonry and salvaged what we could. However, due to the force of the wind and the age of the existing mortar, we experienced a high attrition rate with the original bricks—most were cracked, snapped, or too compromised to reuse safely.

To ensure a seamless visual match with the remaining intact brickwork, we needed to source specific matching bricks. While both Selco and Jewson held the right stock locally, we opted to collect them from our local Jewson branch, utilizing our trade credit account to keep procurement fast and straightforward for the insurance claim. At £1.37 per brick, replacing the bulk of the wall required careful planning and accurate estimating to keep costs transparent for the insurer while maintaining strict structural standards.

The Rebuild

With fresh materials on site and protective sheeting laid down to keep the footpath and tarmac clean, our bricklayers got to work:

  • Boundary Wall: Working carefully around the existing Laneham Avenue street sign and sloped pavement, we rebuilt the stepped boundary wall using matching bricks and finished it with a traditional brick-on-edge soldier course coping to tie into the surviving section.
  • Driveway Pillars: Alongside the main boundary repair, we also reconstructed the customer’s driveway pillars, topping them with weather-resistant coping stones to restore the entranceway.

Responsible Waste Disposal & Final Handover

A major part of any insurance reinstatement is leaving the property safe and spotless. All damaged bricks, old mortar, and site debris were cleared and transferred to one of our own skips for proper sorting and recycling.

We swept down the pavement and driveway, leaving the entire frontage clean, tidy, and structurally sound—to the complete satisfaction of both the homeowner and the insurance company.

Need help with storm damage or insurance brickwork repairs in Nottingham? Whether it’s a collapsed garden wall, damaged pillars, or structural repointing, get in touch with our team today for a reliable, insurance-approved quote.

Categories
Bathroom Internal fit out

Project Spotlight: Delivering a Luxury, Step-Free Wet Room Transformation in Bulwell

When our customer in Bulwell reached out, their brief was ambitious and clear: they wanted nothing short of the finest bathroom in the area, complete with seamless, step-free access into the shower.

Achieving a high-end finish is about far more than just what looks pretty on the surface—it’s about precision prep, premium components, and working around real-world living conditions to get every detail right.

Phase 1: Design & Sourcing with Trusted Local Partners

A bespoke bathroom requires top-tier materials. We directed our client to two of our trusted local specialist suppliers: East Midlands Ceramics for tile selections and Michael Pavis for sanitaryware and brassware. Both teams walked the client through various layouts, finishes, and technical configurations, helping narrow down a timeless palette of marble-effect wall tiles, natural oak vanity tones, and polished chrome accents.

Phase 2: The Strip-Out & Foundation Work

Behind every flawless tile job is solid preparation. Once we started the strip-out, we uncovered three separate layers of old tiles layered on top of one another on the walls.

To do this right, there were no shortcuts:

  • Complete Back-to-Brick Demolition: We stripped all three layers of old tile back to the core structure.
  • Full Re-Plastering: All wall surfaces were freshly plastered and prepped to ensure dead-flat, plumb lines for the new tiles.
  • Subfloor Former Installation: To achieve true step-free access without an unsightly raised tray, we recessed a dedicated shower former into the floor, waterproofing the area thoroughly to create a genuine flush wet room floor.

The Standout Feature: The Merlyn Shower Enclosure

Quality bathrooms require investment, and this project didn’t compromise. A centerpiece of this installation is the Merlyn shower screen.

Crafted with heavy-duty 8mm toughened safety glass and an ultra-smooth, precision-engineered mechanism, the screen alone represents a £1,600 investment. Paired with a dual-outlet thermostatic rainfall shower system, it delivers both modern minimalist aesthetics and long-term durability.

Overcoming the Realities of the Build

Bathroom renovations are invasive—especially when the room being renovated houses the property’s only toilet, and the homeowners are in the house throughout the working day.

The extensive prep work, remedial plastering, and intricate tiling meant the project took longer than initially scheduled, totaling 15 man-days on site. Throughout the entire process, our priority was keeping disruption to an absolute minimum:

  • Ensuring operational sanitation facilities were reconnected and accessible whenever needed.
  • Keeping tidy transit paths and clear daily communication so the household could function comfortably while work progressed.

The Final Result

The finished room speaks for itself: flush level-access showering, sleek integrated vanity and concealed-cistern storage, a chrome ladder radiator, and floor-to-ceiling tiling finished to the highest standard.

Most importantly, our client was delighted with both the craftsmanship and the way our team handled the day-to-day challenges of the build.

Planning a bathroom remodel or considering a step-free wet room conversion in Nottingham? Get in touch with our team to discuss your ideas and book a consultation.

Categories
Renovation

Transforming Living Space on Valley Road: Kitchen Knock-Through & Utility Fit-Out

Opening up a home to create a seamless, open-plan flow completely changes everyday family living. On our latest project along Valley Road in Nottingham, we carried out a full structural alteration and utility fit-out designed to unlock the property’s potential.

Here is a closer look behind the scenes at how the build came together.

Knocking Through: Installing the Structural Steel

The main objective for the homeowner was connecting the existing kitchen into their new extension to form a spacious, bright living and dining hub.

To achieve this:

  • We supported the existing brickwork and upper joists using heavy-duty Acrow props and strongboys.
  • Knocked out the load-bearing dividing wall to open the span between the two areas.
  • Hoisted and set the new steel RSJ beam securely in place to carry the structural load of the floor above.
  • With the steel in, the barrier between the kitchen and extension is gone, creating the expansive, unified room the client envisioned.

Smart Layout Solutions: Relocating the Boiler & Gas Supply

When designing open-plan kitchens, appliance placement can quickly become a hurdle. The original boiler position sat right where the new layout needed clean lines and uninterrupted wall space.

To ensure the new kitchen wasn’t compromised, we carried out substantial mechanical work:

  • Gas & Pipework Rerouting: Rerouted the main gas supply line and primary central heating pipework.
  • Boiler Relocation: Moved and remounted the combi boiler neatly onto backer board inside the dedicated utility area, setting up all new copper pipe runs, condensate drainage, and flue routing.

Relocating the boiler entirely out of the primary kitchen zone keeps the new entertaining space uncluttered while grouping core services together.

Fitting Out the Utility Room

With the heavy structural work complete and pipework repositioned, the focus shifted to the dedicated utility space.

We installed stud framing along the perimeter walls to conceal:

  • Hot and cold feeds for washing appliances and a utility sink.
  • Upgraded soil and waste pipes.
  • Electrical first-fix wiring.

Having a separate utility room keeps laundry, noisy white goods, and boiler equipment tucked away, letting the new kitchen remain the social focal point of the house.

Planning an open-plan renovation or home extension in Nottingham? Whether you need structural alterations, RSJ installations, or complete plumbing and fit-out work, get in touch with our team today to discuss your next project.