Categories
Bathroom Internal fit out

Project Spotlight: Delivering a Luxury, Step-Free Wet Room Transformation in Bulwell

When our customer in Bulwell reached out, their brief was ambitious and clear: they wanted nothing short of the finest bathroom in the area, complete with seamless, step-free access into the shower.

Achieving a high-end finish is about far more than just what looks pretty on the surface—it’s about precision prep, premium components, and working around real-world living conditions to get every detail right.

Phase 1: Design & Sourcing with Trusted Local Partners

A bespoke bathroom requires top-tier materials. We directed our client to two of our trusted local specialist suppliers: East Midlands Ceramics for tile selections and Michael Pavis for sanitaryware and brassware. Both teams walked the client through various layouts, finishes, and technical configurations, helping narrow down a timeless palette of marble-effect wall tiles, natural oak vanity tones, and polished chrome accents.

Phase 2: The Strip-Out & Foundation Work

Behind every flawless tile job is solid preparation. Once we started the strip-out, we uncovered three separate layers of old tiles layered on top of one another on the walls.

To do this right, there were no shortcuts:

  • Complete Back-to-Brick Demolition: We stripped all three layers of old tile back to the core structure.
  • Full Re-Plastering: All wall surfaces were freshly plastered and prepped to ensure dead-flat, plumb lines for the new tiles.
  • Subfloor Former Installation: To achieve true step-free access without an unsightly raised tray, we recessed a dedicated shower former into the floor, waterproofing the area thoroughly to create a genuine flush wet room floor.

The Standout Feature: The Merlyn Shower Enclosure

Quality bathrooms require investment, and this project didn’t compromise. A centerpiece of this installation is the Merlyn shower screen.

Crafted with heavy-duty 8mm toughened safety glass and an ultra-smooth, precision-engineered mechanism, the screen alone represents a £1,600 investment. Paired with a dual-outlet thermostatic rainfall shower system, it delivers both modern minimalist aesthetics and long-term durability.

Overcoming the Realities of the Build

Bathroom renovations are invasive—especially when the room being renovated houses the property’s only toilet, and the homeowners are in the house throughout the working day.

The extensive prep work, remedial plastering, and intricate tiling meant the project took longer than initially scheduled, totaling 15 man-days on site. Throughout the entire process, our priority was keeping disruption to an absolute minimum:

  • Ensuring operational sanitation facilities were reconnected and accessible whenever needed.
  • Keeping tidy transit paths and clear daily communication so the household could function comfortably while work progressed.

The Final Result

The finished room speaks for itself: flush level-access showering, sleek integrated vanity and concealed-cistern storage, a chrome ladder radiator, and floor-to-ceiling tiling finished to the highest standard.

Most importantly, our client was delighted with both the craftsmanship and the way our team handled the day-to-day challenges of the build.

Planning a bathroom remodel or considering a step-free wet room conversion in Nottingham? Get in touch with our team to discuss your ideas and book a consultation.

Categories
Bathroom

Bathroom remodel

Case Study: Bathroom Reconfiguration and Specialist Upgrades

This project focused on a comprehensive bathroom refurbishment, involving plumbing & electrical modifications to resolve functional issues and enhance the client’s living space. Providing a private bathroom for a family member and a separate space to store shoes that cog up the hallway.

Project Scope and Functional Redesign

The primary drivers for this renovation were to remedy a leak in the shattaf/shower douche unit and to improve the home’s utility by removing the ‘Jack and Jill’ dual-access feature. By eliminating the second doorway, we successfully partitioned the space to create a dedicated cloakroom/shoe cupboard and a more private, functional single bathroom. This reconfiguration maximized the available floorplan to deliver a new, tailored storage solution.

IMG_6102
previous arrow
next arrow

Electrical and Plumbing Upgrades

The renovation included complex electrical work to ensure safety and regulatory compliance. The existing lighting system was consolidated into a single circuit controlled by dual switches. Our team expertly isolated and divided this legacy system to establish two individual, independent lighting circuits—one for the main bathroom and a separate circuit for the new cloakroom. This precise re-wiring ensures full compliance with modern electrical standards and provides independent control for the segregated areas.

In the plumbing specification, client safety and ease-of-use were paramount. The isolation valve on the shattaf unit was required to be highly accessible and simple to operate. We rejected the original unit and procured a replacement featuring a superior, ergonomic handle. The new isolation valve was installed in line with industry best practice for functionality, correctly positioned on the right-hand side of the toilet.

Finishing Solutions: Efficiency and Aesthetic Integration

To meet the client’s preference for minimal disruption and to avoid the cost and time associated with full re-tiling, we deployed high-quality shower panels. This method provided a seamless, waterproof finish that was selected to harmoniously integrate with the existing tiling, delivering a premium look with enhanced project efficiency.

Project Metrics: Delivery and Investment

This comprehensive refurbishment was executed with controlled precision, demonstrating our ability to deliver complex projects efficiently:

  • Timeline: The project was completed in approximately one week from start to finish.
  • Cost Breakdown (Excluding VAT):
    • Materials: £1,200
    • Labour: £2,800
    • Electrics (including lights and extractor fan): £400
    • Plastering: £300
    • Joinery: £300
    • Total Project Investment (Excluding VAT): £5,000
Categories
Bathroom

Bathroom refurbishment

Refurbishment of a bathroom for one of our existing clients on a tight budget.

Our customer asked us to get involved because they wanted a second opinion on the plumber who claimed moisture was just getting in behind the back of the tiles. On closer inspection the Bath Plumbing supply and basin waste had both been leaking for years Meaning the entire floor needed to be replaced. We completed the work for the customer in 3 1/2 days fitting in around the time when their tenants were on holiday and the property vacant.

We could’ve purchased a cheap bathroom Selco, but we got a decent quality item from Michael Pavis at a reasonable price which included an anti slip floor.

We fitted a hansgrohe bath/shower mixer tap so it would keep the pipes exposed and provide a robust solution given the quality of the product products that hansgrohe produces

We used a an aqua panel so there was less maintenance required in the future and no grout to clean between tenancies.

Able to keep the toilet as it has been replaced by Plumber in the last 12 months.

We still have the boxing to do on this photo

Joiner installed the Bath and used CLS timber to make larger feet areas to spread the load from the bath. The bath also included 6 feet rather than the normal five.

The leak had been so bad the insulation in the wall was absolutely sodden wet, acting like a sponge.

If the customer had listened to the Plumber, they would have wasted £250 regrouting the tiles. All the while their property would have been damaged further, luckily it wasn’t so bad that we had to replace the joists. We did however have to replace the floor with an 18 mm moisture resistant chipboard.

Categories
Bathroom Brickwork Extension Flooring Groundwork Kitchen New build Renovation Roofing Uncategorised

Nottingham Refurbishment & extension

This was a large contract which involved building onto a 1930’s house.

We built a large open plan kitchen diner downstairs with a boot room, playroom and for home working. Upstairs we created an additional en suite bedroom .