Categories
Uncategorised

Bulwell bathroom

Our customer’s brief was very clear: they wanted the best bathroom in Bulwell.
While their existing bathroom had served them well for years, it was time for an upgrade. They wanted a modern wet room with step-free shower access, high-end fittings, spotlights, his-and-hers cabinets, and a vanity unit matching their existing setup.
After providing an outline quote, our customer visited our trusted local suppliers—East Midland Ceramics and Michael Pavis. Both offer the kind of traditional showroom experience and product knowledge you simply can’t get from online marketplaces. Special thanks to Luke Henson at Michael Pavis for 5-star customer service. The quotes came right in line with our expectations (£1,400 for the shower screen and door after trade discount—though you can’t beat Merlyn 8mm fittings for quality).
We started by stripping the walls, which revealed three layers of tiles. It’s safe to say we were glad we ordered a skip from Enva, making sure to put protective boards down so the block paving didn’t get marked.
Next, we removed the existing floor and laid 15mm plywood followed by tile backer boards, and fitted a Qualitex floor profile for the shower. Minimising the step between the entrance hall and bathroom was very important to the customer to remove the trip hazard.
Finally, to make sure the water pressure matched the ambition of the project, we fitted a Stuart Turner Universal 2-bar pump supplied by Pavis. This didn’t just deliver for the wet room—it drastically improved the hot water pressure in the kitchen sink, too.
In total the work will take about 14 days, our bathroom installer is pulling in the weekends to get it finished for the customer. We appreciate that the work creates a lot of inconvenience to the customer.

← Back

Thank you for your response. ✨

Categories
Bathroom

Bathroom remodel

Case Study: Bathroom Reconfiguration and Specialist Upgrades

This project focused on a comprehensive bathroom refurbishment, involving plumbing & electrical modifications to resolve functional issues and enhance the client’s living space. Providing a private bathroom for a family member and a separate space to store shoes that cog up the hallway.

Project Scope and Functional Redesign

The primary drivers for this renovation were to remedy a leak in the shattaf/shower douche unit and to improve the home’s utility by removing the ‘Jack and Jill’ dual-access feature. By eliminating the second doorway, we successfully partitioned the space to create a dedicated cloakroom/shoe cupboard and a more private, functional single bathroom. This reconfiguration maximized the available floorplan to deliver a new, tailored storage solution.

IMG_6102
previous arrow
next arrow

Electrical and Plumbing Upgrades

The renovation included complex electrical work to ensure safety and regulatory compliance. The existing lighting system was consolidated into a single circuit controlled by dual switches. Our team expertly isolated and divided this legacy system to establish two individual, independent lighting circuits—one for the main bathroom and a separate circuit for the new cloakroom. This precise re-wiring ensures full compliance with modern electrical standards and provides independent control for the segregated areas.

In the plumbing specification, client safety and ease-of-use were paramount. The isolation valve on the shattaf unit was required to be highly accessible and simple to operate. We rejected the original unit and procured a replacement featuring a superior, ergonomic handle. The new isolation valve was installed in line with industry best practice for functionality, correctly positioned on the right-hand side of the toilet.

Finishing Solutions: Efficiency and Aesthetic Integration

To meet the client’s preference for minimal disruption and to avoid the cost and time associated with full re-tiling, we deployed high-quality shower panels. This method provided a seamless, waterproof finish that was selected to harmoniously integrate with the existing tiling, delivering a premium look with enhanced project efficiency.

Project Metrics: Delivery and Investment

This comprehensive refurbishment was executed with controlled precision, demonstrating our ability to deliver complex projects efficiently:

  • Timeline: The project was completed in approximately one week from start to finish.
  • Cost Breakdown (Excluding VAT):
    • Materials: £1,200
    • Labour: £2,800
    • Electrics (including lights and extractor fan): £400
    • Plastering: £300
    • Joinery: £300
    • Total Project Investment (Excluding VAT): £5,000