Upgrading a Manhole Cover in Long Eaton: Step-by-Step Replacement Guide

An old, damaged, or ill-fitting drain cover isn’t just an eyesore—it poses a serious tripping hazard and can allow unpleasant drain odours or surface water to compromise your property. We recently completed a manhole lid replacement job for a client in Long Eaton, restoring both safety and functionality to their outdoor space.

The Project Scope

The original installation had seen better days, requiring a complete frame and cover replacement. Accessing the brick-built inspection chamber meant carefully removing the surrounding compromised concrete without damaging the underlying brickwork or pipe channels.

Before we could start we had to cut a padlock off the gate (new padlock and keys delivered to householder and estate agent)

Here is how the repair was executed step-by-step:

  1. Excavation & Frame Prep: We cut back the damaged concrete around the perimeter using a disc cutter to create a clean boundary. The old frame was removed, exposing the brick inspection chamber beneath.
  2. Setting the New Frame: A fresh bed of high-strength mortar was laid directly onto the brickwork to ensure a level, watertight seal. The new recess frame was positioned flush with the surrounding ground level.
  3. Haunching & Concrete Fill: Fresh concrete mix was troweled smoothly around the frame to anchor it firmly into place, ensuring it can withstand regular foot traffic without cracking or shifting.
  4. Fitting the Clark-Drain Lid: A durable, galvanized steel Clark-Drain cover complete with quick-release lifting handles was seated into the recessed frame for a flush finish.

Why Replace an Old Drain Cover?

  • Eliminate Trip Hazards: Sinking or cracked covers create dangerous uneven surfaces around side alleys and driveways.
  • Prevent Odours & Pest Access: A sealed, properly bedded frame keeps drain smells contained and deters rodents.
  • Durable & Weather-Resistant: Modern galvanized steel covers like Clark-Drain units offer superior rust protection compared to aging cast-iron covers.

Need drain repairs or manhole cover replacements in Long Eaton or surrounding areas? Contact us today for a quick quote!

Categories
Uncategorised

Bulwell bathroom

Our customer’s brief was very clear: they wanted the best bathroom in Bulwell.
While their existing bathroom had served them well for years, it was time for an upgrade. They wanted a modern wet room with step-free shower access, high-end fittings, spotlights, his-and-hers cabinets, and a vanity unit matching their existing setup.
After providing an outline quote, our customer visited our trusted local suppliers—East Midland Ceramics and Michael Pavis. Both offer the kind of traditional showroom experience and product knowledge you simply can’t get from online marketplaces. Special thanks to Luke Henson at Michael Pavis for 5-star customer service. The quotes came right in line with our expectations (£1,400 for the shower screen and door after trade discount—though you can’t beat Merlyn 8mm fittings for quality).
We started by stripping the walls, which revealed three layers of tiles. It’s safe to say we were glad we ordered a skip from Enva, making sure to put protective boards down so the block paving didn’t get marked.
Next, we removed the existing floor and laid 15mm plywood followed by tile backer boards, and fitted a Qualitex floor profile for the shower. Minimising the step between the entrance hall and bathroom was very important to the customer to remove the trip hazard.
Finally, to make sure the water pressure matched the ambition of the project, we fitted a Stuart Turner Universal 2-bar pump supplied by Pavis. This didn’t just deliver for the wet room—it drastically improved the hot water pressure in the kitchen sink, too.
In total the work will take about 14 days, our bathroom installer is pulling in the weekends to get it finished for the customer. We appreciate that the work creates a lot of inconvenience to the customer.

← Back

Thank you for your response. ✨

Categories
Brickwork

Valley Road extension ready for scaffolding

Valley Road Extension: Wall Construction & Roof Framing Complete

The concrete floor for our Valley Road extension project has been poured, and the brick walls are officially up!

We built the exterior walls using a 150mm full-fill cavity insulation method. We prefer this approach on our projects because it significantly reduces thermal bridging and air leakage routes, creating a warmer, more energy-efficient structure for the homeowner.

We tend to get our insulation and plasterboard from Galaxy Insulation in Long Eaton as the prices a re competitive and they always given un biased advice.

A red brick house extension under construction with wooden roof joists and insulation
Valley Road rear elevation
PlayPause
previous arrow
next arrow

The timber roof structure is now completely framed and in place. We are currently awaiting scaffolding installation to begin the roofing works and make the entire structure fully watertight.

Stay tuned for more updates as this project progresses!

Categories
External Groundwork

Upgrading Garden Planters in Beeston

While timber sleepers are a popular choice for garden borders and raised beds, weather exposure over time inevitably takes its toll. In this recent project, the client’s existing oak sleeper planters were beginning to pull apart, decay, and lose structural integrity. They wanted a long-term, permanent solution that would hold up to the elements without sacrificing style.

The Project Overview

  • Out with the Old: We completely removed the shifting oak sleepers and excavated solid footings to ensure a strong base for the new masonry. We sourced a skip larger than was required so we could also remove clear the customers debris stockpile from their garden which will free up space for future projects. In total we filled an 8 yard skip for the project.
  • Durable Brick Construction: We used Ibstock Cattybrook Bristol Buff sourced from John A Stephens in Nottingham, they were the only local branch to hold them. We used them as they matched the house to give a smoother aesthetic, we built the retaining walls and raised planters to complement the existing home and garden layout.
  • Staffordshire Blue Finish: To top off the walls, we laid double bullnose Staffordshire blue bricks along the coping. The smooth, rounded edges give a clean, professional finish that doubles as comfortable garden coping.
  • Moisture Protection: We applied a tanking slurry to limit the moisture transferring to the bricks. We used engineering spec bricks which can be laid underground but the tanking can’t hurt and is a belt and braces approach.
  • Acaster dug out
    PlayPause
    previous arrow
    next arrow

Why Choose Double Bullnose Staffordshire Blue’s for the soldier course?

  1. Unmatched Durability: Staffordshire blue bricks are renowned for high strength and exceptionally low water absorption, making them ideal for ground-level garden exposure.
  2. Safety & Comfort: The dual-rounded bullnose profile removes sharp corners—perfect for family gardens and comfortable to lean against or sit on.
  3. Striking Contrast: The deep slate-blue tone creates a sharp, modern contrast against warm orange brickwork and green foliage.
  4. Corner headers: We managed to source corner headers which really finish it off nicely, though they are £60 each including VAT 

Looking to upgrade tired timber features in your garden to a clean, permanent brick structure? Get in touch today for a free consultation and quote! Call us on 07737 988 243

Categories
Extension Uncategorised

Site Update: Progressing Well at Valley Road Extension

After working through a few tricky hurdles early on, our home extension project on Valley Road is now coming together well.

Groundworks can throw up unexpected challenges, but taking the extra time to get the foundational elements done right always pays off in the long run.

Getting the Drainage Right (And Maintenance-Proof)

Looking at the drainage layout, the pipework route might look a bit complex at first glance—but there’s solid reasoning behind it. We designed the system so every single point can be rodded from both ends. This extra step ensures that if future maintenance is ever required, clearing blockages will be straightforward and hassle-free.

Because the main public sewer runs directly beneath the center of the new extension, we had to strictly follow regulations to protect both the utility and the build:

  • CCTV Integrity Scans: We partnered with Drain Scan Nottingham to conduct thorough pre- and post-construction camera scans to verify the pipe’s structural integrity.
  • Severn Trent Build-Over Agreement: With scan evidence in hand, we secured a formal build-over agreement from Severn Trent Water.

A Quick Tip for Homeowners: Skipping a build-over agreement is a massive risk. If you build over a public utility without proper consent, water authorities have the legal power to demand you dismantle the structure to access their pipes. It is simply never worth cutting corners on legal approvals!

Brickwork Taking Shape

With the groundworks signed off, the superstructure is moving fast! The bricklayers are now laying 73mm Carlton Clayburn Civic bricks, supplied directly by Jewson in Basford. The match looks fantastic, and seeing the walls rise brings us one step closer to completing a top-quality living space.

Stay tuned for more updates as this build continues to take shape!

Categories
Uncategorised

Reliable Crash Deck Hire Across Nottinghamshire & Beyond

Looking for safe, reliable, and compliant working platform solutions for your next construction project? We’ve got you covered.

We recently supplied and delivered a full safety deck system to a site in Cherry Willingham, near Lincoln, supporting a project with a 16-week rental period. Whether you’re working on a residential extension, a new build plot, or a commercial development, our equipment ensures your team stays safe at height without slowing down productivity.

Why Choose Our Safety Decking Hire?

  • Flexible Quantities: We cater to small-to-medium developments, supplying high-quality crash deck solutions for project areas up to 200 m².
  • Flexible Hire Periods: From short-term fixes to multi-month site projects like our recent 16-week hire in Lincolnshire, we offer competitive rates tailored to your timeline.
  • Quick Delivery & Setup: Based conveniently to serve Nottinghamshire, Lincolnshire, and the surrounding East Midlands regions, we ensure prompt, reliable drop-offs directly to your job site.
  • Site Safety Standard: Lightweight, sturdy, and easy to erect, our decking systems meet stringent safety requirements to give you full peace of mind.

Secure Decking for Your Next Build

Whether you need fall prevention for bricklayers, joiners, or roofers, get in touch today to discuss your site dimensions and secure your hire slot.

Get in Touch Today

  • Call/ text : 07737 988243
Categories
Kitchen Renovation

Another Herringbone floor

The Melbury Road, Woodthrope project is progressing smoothly! We recently opened up the kitchen and dining space to create a more expansive feel.

Steels need to be supported by 30minute fire protection, achieved in this case by 12.5mm Fireboard & skim. The steels are attached to a metal frame around the beam rather than onto timber noggins.

While we initially considered filling and sanding the existing walls, we opted to fully replaster both the walls and ceilings. This approach is not only more efficient but guarantees a flawless, high-quality finish.

Replastered kitchen diner

As soon as the fresh plaster was ready, we laid a stunning new Herringbone oak floor from Stories Flooring. With the floors down, our next step is to install a brand-new TKC kitchen from Huws Gray.

Herringbone flooring
Ready for the kitchen.

A quick tip for renovations: Huws Gray provides a convenient measuring service and offers 12 months of interest-free credit. Just keep in mind that this finance offer cannot be combined with a builder’s trade price discount.

Categories
External Groundwork

Shed Removal & Waste Disposal in Cotgrave

Need to reclaim your garden space? We specialize in the safe and efficient removal of old garden sheds, taking the hassle out of the process for you.

Ready for replacement

Our experienced team will dismantle your unwanted shed, ensuring all waste—from old wood and roofing felt to glass and any contents—is cleared away completely. We prioritize responsible waste management, disposing of all materials at approved special facilities, so you can have peace of mind that it is handled legally and with care for the environment.

Get your garden back! Contact us today for a free quote.

The next set of images will be the new base and the sheds replacement.

Categories
Kitchen Renovation Uncategorised

Steel beam install

Transforming Spaces: Open-Plan Kitchen Diner Project in Woodthorpe, Nottingham

At Swallow Hill Homes, we love helping clients unlock the full potential of their properties. We are currently on-site in Woodthorpe, Nottingham, executing a structural alteration to create a open-plan kitchen and dining area.

To safely knock down the load-bearing wall separating the spaces, structural integrity is paramount. Here is a look behind the scenes at how our team is delivering this transformation:

  • Temporary Structural Support: Before removing any load-bearing masonry, heavy-duty adjustable steel props (Acrow props) and strongbacks were installed to fully support the floor joists and ceiling structure above.
  • Engineering Excellence: We installed a heavy-gauge RSJ (rolled steel joist) treated with red oxide protective coating to span the newly created opening.
  • Solid Load Transfer: The steel RSJ rests securely on newly constructed high-density engineering brick piers and concrete padstones, ensuring structural loads are distributed safely into the foundation.
  • Precision Execution: Every phase was closely monitored to ensure full compliance with building regulations, precision leveling, and absolute safety on site.

Once the remaining masonry is fully knocked through and structural load tests are complete, the temporary props will come down, leaving a spacious, light-filled layout ready for modern kitchen fitting, plastering, and finishing touches.

Looking to modernize your home or create an open-plan living space in Nottinghamshire? Contact the Swallow Hill Homes team today to discuss your project!

Categories
External

Security gate

As part of a recent home renovation, our client wanted to replace their existing garden gate with something significantly more secure—while keeping costs sensible.

We sourced a pre-painted steel gate from Screwfix for around £200, which features an integrated lock and decorative fleur-de-lis spikes for added climb prevention. While it’s not a bespoke £1,000 custom gate, it offers really good value and security for anyone working to a budget.

Our team completed the installation in just a couple of hours and disposed of the old gate to a certified disposal facility.



Categories
Roofing

Gable end and dwarf wall repointing

Gable End and Dwarf Wall Repointing

We were recently called out by a customer whose existing gable end pointing had begun to weather and drop out over time. While we frequently recommend and install modern dry verge systems these days for a maintenance-free finish, this customer preferred to maintain the traditional mortar look for their roofline.

The stick isn’t permanent, just to supper whilst it’s drying out.

To ensure a high-quality, long-lasting repair, we carefully raked out all the old, loose mortar to create a solid base before expertly repointing the entire gable end. (Note: If you spot a stick in the photos, don’t worry—it’s definitely not a permanent fixture! It’s simply there to provide temporary support while the fresh mortar dries and sets into place).

While we were on site, we also tackled some essential maintenance on the customer’s dwarf wall. The coping stones had become loose, so we lifted them up, cleared away the old debris, and securely relaid them. The wall is now structurally sound and looking smart once again!

Categories
Renovation Roofing Windows

Garden room roof refurbishment

 

Garden Room Roof Refurbishment

Our customer reached out to us to replace the roof on their garden room. Over the years, several joists had succumbed to rot, which was letting down the rest of an otherwise pristine property.

We began by removing the existing roof, which revealed a higher level of degradation than we initially anticipated. As part of the update, we also fitted a brand-new window from Vale Windows in Mansfield for the potting shed.

For the new structure, we used pressure-treated timber overlaid with UPVC cladding for a clean, modern appearance. The new roofing sheets were supplied by Amari plastics, who provided a fantastic specialist cutting service to ensure a perfect fit.

Safety is always a priority, so we completely removed the existing wiring, which was no longer up to standard. We upgraded the setup by installing two new IP65-rated electrical boxes and a new IP65 light in the potting shed.

To finish off the project, we painted all exposed timber with Scuff-X base. While it’s a premium product, you simply can’t beat it for its exceptional coverage and durability!

Finally, a massive thank you to our wonderful customer for giving our team a thoughtful present at the end of the job. It was a pleasure working on this project!

Categories
Painting Renovation

Mapperley Flat redecoration

Case Study: Rapid 72-Hour Flat Refresh for a Repeat Client

Kitchen

When managing rental properties, timing is everything. A repeat client recently reached out to us with a tight four-day window before their new tenant moved in. With brand-new carpets booked to be laid on day three, the property needed a complete paint refresh on a strict deadline—and at a sensible, affordable price point.

Here is how we made it happen without a single hitch.

The Challenge: A 4-Day Window

Between outgoing and incoming tenants, schedule overlaps can easily derail a handover. Our client’s regular decorator hadn’t replied to them and with only 4 days to go they needed all walls and ceilings painted throughout the flat, but the space had to be completely clear, clean, and dry within 72 hours so the carpet fitters could work uninterrupted on day four.

The Solution: Fast Execution & Total Peace of Mind

  • Complete Trust: Because the landlord had worked with Swallow Hill Homes before, there was no need to arrange a time-consuming on-site meeting. They simply handed over the keys, confident that the property was in safe hands.

  • 48-Hour Turnaround: Our team got straight to work, applying a fresh coat of paint to every wall and ceiling, transforming the space in just two days.

  • Zero Disruption: We knew our client was busy at work, so we kept them updated with brief text messages and emails at key progress points. They were able to focus on their day job knowing the project was moving forward smoothly.

  • On-Time Handover: We wrapped up on schedule, leaving the property clean, dry, and ready for the carpet fitters to arrive on day three. Dropping the keys off with the customer for their convenience.

The Result

The new tenant moved into a bright, fresh, and modern home right on schedule on day four. The landlord achieved a high-standard finish between tenancies without losing rental income, overspending, or taking time off work to manage contractors.

Planning a property refresh between tenancies? Whether you need a quick turnaround or a complete renovation, working with a team you trust makes all the difference. Contact Swallow Hill Homes today on 07737 988 243 to discuss your next project.

Categories
Uncategorised

Bunny kitchen replacement.

Project Showcase: Stunning Symphony Avebury Kitchen Installation in Bunny, Nottinghamshire

Repeat clients are the ultimate testament to our work, and we were thrilled when a previous customer invited us back to handle their latest project: a brand-new kitchen installation in the quiet village of Bunny, South Nottinghamshire.

For this build, we sourced the contemporary-yet-timeless Avebury kitchen range from the Symphony Group through our trusted local merchant, Huws Grey.

The Design: Symphony Avebury Range

The Avebury is a smooth, five-piece shaker design that bridges the gap between classic craftsmanship and clean, modern styling. Classified under Price Band 2, it offers fantastic quality and aesthetic appeal without breaking the budget.

  • Door Style: Timeless five-piece smooth shaker with a refined matt finish.

  • Colour Palette: Available in versatile, neutral tones including Cobble Grey, Platinum, Sage, and Stone.

  • Smart Storage & Accents: Paired with custom handles, premium work surfaces, and functional storage solutions like pull-out larders and space-saving corner carousels to maximize every inch of the room.

Craftsmanship & Installation

Installing a kitchen requires precision, from leveling base units to plumbing and getting the worktop joins seamlessly flush. Because we already knew the property and the client’s standards, the installation ran smoothly from start to finish, minimizing disruption to their home.

The finished space combines practical, hard-wearing storage with a sleek, elegant aesthetic that completely transforms the heart of the home.

The floor was came from Brooks Bros in Nottingham –  Rustic Oak brushed (M4005)

The splash back wall tiles came from Topps tiles and were Hartley Sand Tiles

Planning a kitchen renovation in Nottinghamshire? Whether you are looking for layout inspiration, trade supply channels, or expert installation, Swallow Hill Homes is here to help. Contact us today to discuss your project.

Categories
External Resin bound gravel

Long Eaton, Derbyshire Resin Bonded Gravel over concrete path

Recent Project: Durable Resin Bonded Gravel Driveway, Long Eaton

Our customer had had a fall from the slightly uneven surface of an old concrete path, she initially contacted us to renew it but we suggested adding resin bonded gravel on top would be a cheaper option and achieve the same effect. First impressions matter. We recently completed a driveway transformation for a client in Long Eaton, Derbyshire, and the choice of surfacing has completely changed the look and functionality of the property frontage.

For this project, we installed Honeycomb-coloured resin-bonded gravel, sourced from the specialists at The Resin Mill. Their website has a really good AI powered visualiser for showing a “before” and “after”

img_7135

Why Resin-Bonded Gravel?

We chose this system for three key reasons:

  • Aesthetics: The charcoal finish provides a crisp, modern contrast that really elevates the home’s exterior. It looks clean, sophisticated, and stays looking that way for a long time.
  • Permeability: Like our previous ramp projects, drainage is key. Resin-bonded systems allow water to permeate the surface naturally, which reduces pooling and takes the pressure off local drainage systems—a huge benefit for any driveway or pathway.
  • Durability: It creates a hard-wearing, slip-resistant finish that stands up well to daily vehicle use and the typical British weather.

Our Installation Process:

  • Preparation: We pressure washed the concrete surface using our high powered pressure washer, and let it dry. We applied a primer to get suitable bonding for the RBG.
  • Precision Application: The resin-bonded gravel was applied to a consistent depth, ensuring a smooth, uniform texture across the entire driveway.
  • Finishing: We ensured all edges were crisp and clearly defined against the existing boundary walls and lawns, providing that “perfect finish” look.

Problems we had along the way

  • We had originally planned to raise the drain cover to the rear of the property but the edge was concreted into the building, we therefore took out the mortar around the edge and flaunched the RBG in so there was no trip hazard.

Project Highlights:

  • Location: Long Eaton, Derbyshire
  • Materials: Charcoal Resin-Bonded Gravel (The Resin Mill)
  • Key Benefits: Excellent drainage, modern aesthetic, slip-resistant, and low-maintenance.

Looking to Upgrade Your Driveway or Pathway?

Whether you’re looking for a low-maintenance driveway or a durable, accessible pathway for your home, we focus on high-quality materials and precise installation.

Let’s get your project off the ground. Contact us on 07737 988 243

Categories
Internal fit out Kitchen

Full stave worktops in Bunny, Nottinghamshire

Recent Project: Stunning Solid Oak Full Stave Worktop Installation in Bunny, Nottinghamshire

There is nothing quite like the warmth and character that natural timber brings into a kitchen. We recently completed a beautiful solid oak worktop installation for a client in Bunny, Nottinghamshire, and the results speak for themselves.

For this project, we precisely cut, joined, and installed premium solid oak worktops to perfectly contour the kitchen’s layout, featuring a seamless corner joint and a classic Belfast sink cutout.What is a “Full Stave” Worktop?

WhatsApp Image 2026-07-17 at 12.24.57

What is the difference between timber worktops. Simply put, a Full Stave worktop is constructed using long, continuous planks of timber that run the entire length of the worktop without any breaks.

Full Stave vs. Finger-Jointed (Standard):

  • Full Stave: The staves run from one end to the other (typically 80mm–250mm wide). They are glued using straight-edge joins, creating a clean, flowing look.
  • Finger-Jointed: Made by joining smaller, shorter blocks together with “teeth” (finger joints) to make up the length.

Why choose Full Stave?

  • Aesthetics: You get a seamless, flowing grain pattern that showcases the timber’s natural beauty and consistent colour. It’s widely considered the high-end, premium choice.
  • Stability: Because you are using continuous, full-length timber rather than smaller glued blocks, the worktop is robust and less prone to warping over time.

Builder’s Note: Full stave worktops are heavy and rigid. They require careful handling during installation, especially when cutting for sinks or hobs, but the final finish is unmatched.

From Raw Timber to Rich Grain

A key part of the magic with solid wood is the finishing process. As you can see from our progress shots, applying a high-quality Osmo protective oil completely transforms the wood—taking the oak from a pale, raw state to a deep, rich golden tone that highlights the natural knots and grain patterns.

Beyond the aesthetics, this oiling creates a durable, water-resistant barrier essential for busy kitchen areas around the sink and cooker.Is Solid Wood Right For You?

We always believe in being honest with our clients:

  • The Pros: If you love timber, nothing can replace that natural texture. With regular care, it is a timeless investment that lasts a lifetime.
  • The Considerations: It is an investment in both material cost and skilled labour. Because solid wood reacts to its environment, it needs to be looked after—regular oiling is a must, and standing water should be avoided. If you’re looking for a low-maintenance, “fit and forget” surface, quartz or granite might be better, but if you want that warm, natural statement piece, there is no substitute for oak.

Project Highlights

  • Location: Bunny, Nottinghamshire
  • Materials: Premium Solid Oak Worktops paired with Sage Green Shaker Cabinets
  • Features: Flawless mitre joints, custom Belfast sink integration, and bespoke window sill styling.
  • Finish: Multi-coat protective specialist wood oil for an enduring satin sheen.

Looking to Upgrade Your Kitchen in Nottinghamshire?

Whether you are based in Bunny, Ruddington, Bradmore, or across Nottingham, we specialize in precise worktop installations, custom joinery, and full kitchen transformations.

Let’s bring your dream kitchen to life.

[ 📞 Get a Free Quote Today on 07737 988243 ] or [ ✉️ Contact Us via Message quote@swallowhillhomes.com]