Site Update: Progressing Well at Valley Road Extension

After working through a few tricky hurdles early on, our home extension project on Valley Road is now coming together well.

Groundworks can throw up unexpected challenges, but taking the extra time to get the foundational elements done right always pays off in the long run.

Getting the Drainage Right (And Maintenance-Proof)

Looking at the drainage layout, the pipework route might look a bit complex at first glance—but there’s solid reasoning behind it. We designed the system so every single point can be rodded from both ends. This extra step ensures that if future maintenance is ever required, clearing blockages will be straightforward and hassle-free.

Because the main public sewer runs directly beneath the center of the new extension, we had to strictly follow regulations to protect both the utility and the build:

  • CCTV Integrity Scans: We partnered with Drain Scan Nottingham to conduct thorough pre- and post-construction camera scans to verify the pipe’s structural integrity.
  • Severn Trent Build-Over Agreement: With scan evidence in hand, we secured a formal build-over agreement from Severn Trent Water.

A Quick Tip for Homeowners: Skipping a build-over agreement is a massive risk. If you build over a public utility without proper consent, water authorities have the legal power to demand you dismantle the structure to access their pipes. It is simply never worth cutting corners on legal approvals!

Brickwork Taking Shape

With the groundworks signed off, the superstructure is moving fast! The bricklayers are now laying 73mm Carlton Clayburn Civic bricks, supplied directly by Jewson in Basford. The match looks fantastic, and seeing the walls rise brings us one step closer to completing a top-quality living space.

Stay tuned for more updates as this build continues to take shape!

Categories
Brickwork Extension New build

Room extension

Awaiting the arrival of the roofers and joiners

Possibly the smallest extension we have done so far. Only 2.5 square meters but it makes the room much more useable and the window lets lots of light in.

We constructed it, then left the roof open until we go to get the roofers on site

At the roof load here is being supported on the props

We fitted blocks above the window lintel because it was going to be covered by the facial soffit boards

The steel lentil was specified by our supplier

We supported the roof on acro pop props whilst we installed the steel lentil.

We install a single long lentil to allow complete freedom of where the internal wall went

Categories
Uncategorised

Brick Pillar repair

The wall was hit by a car, whose insurance covered the cost of the repairs.

To get a top quality finish we had to source matching in bricks from a reclamation yard in Derby at £2 per brick.

The final job looks like it has stood for 100 years.