The shattaf/ shower douche was leaking for this customer and they wanted to remove the jack and gill feature of the bathroom to allow for a separate shoe cupboard.

the in actually it’s quite challenging because the lighting circuit was previously run from two switches and these needed to be divided into two so a separate light could be run in the cloakroom area


The customer wanted an easy to use isolation valve on the shattaf



Leave a Reply
You must be logged in to post a comment.